Astera Station
General Category => General Discussion => Topic started by: Robbin92P0 on September 12, 2026, 05:05:15 AM
-
It can be added later, and many facilities do exactly that as budgets allow, but retrofitting is generally more disruptive and costlier than including FRESH USA IT asset tracking (https://www.fresh222.com/data-center-physical-security/) in the original design because cabling and cabinet hardware often need to be reworked.